您選擇的商品

Decommissioning the Pickering Nuclear Generating Station: 2024 or 2054?

Peter C. Bell; Ken Mark;

商品編號:9B18M180
出版日期:2018/11/29
再版日期:2018/11/29
商品來源:Ivey
商品主題:General Management/Strategy
商品類型:Case (Field)
涵蓋議題:nuclear;operations research;capital
難易度:4 - Undergraduate/MBA
內容長度:7 頁
地域:Canada
產業:Utilities;
事件年度:2017

In 2017, a strategic analyst with the Ontario Ministry of Energy, was asked to evaluate the potential for decommissioning the Ontario Power Generation's Pickering Nuclear Generating Station (Pickering) in Pickering, Ontario, at the scheduled end of the plant’s operations in 2024, instead of waiting until 2054. Decommissioning Pickering would require $5.264 billion in 2016 terms. Storing the spent fuel would cost another $4.3 billion, for a total of $9.564 billion. Ontario Power Generation had set aside $2.75 billion for decommissioning Pickering and for long-term storage of its spent fuel. To bridge the gap between what it had contributed and what was required, Ontario Power Generation was investing in a decommissioning fund and assuming that its investment would increase in real terms by 3.25 per cent a year. The strategic analyst had to examine what it would cost to decommission Pickering in 2024 versus what it would cost in 2054.

教學手冊:8B18M180;
補充材料: