您選擇的商品

Indian Railways: Estimating Electrical Contract Demand

Samir Biswas, Preetam Basu

商品編號:W25028
出版日期:2021/09/09
再版日期:
商品來源:
商品主題:Management Science; Operations Management
商品類型:
涵蓋議題:Capacity Planning;Forecasting;Monte Carlo Simulation;Risk Analysis;Decision Making
難易度:4 - Undergraduate/MBA
內容長度:5 頁
地域:India
產業:Utilities
事件年度:2019

At the very end of 2019, Jay Prakash Pal, divisional electrical engineer (Traction Distribution) for the Sealdah division of Eastern Railway in India, was asked to prepare a consolidated report for revising the contract demand with power distribution companies. Over the last six months, demand charge penalties had been imposed on multiple occasions for two power stations under his jurisdiction (Barasat traction sub-station and Sonarpur feeding post), as the monthly maximum demand had crossed the existing contract demand for these stations. He would have to provide a revised contract demand value to minimize the annual expenditure due to a demand charge penalty for the next year. While proposing the new contract demand, he would also have to ensure that the cost arising from the unutilized portion of the minimum guaranteed demand would be minimal.

教學手冊:W25030
補充材料:W25029